Friday, March 20, 2009
Update - Day 27
Plumbing tubes viewed from inside the fence, sewer diggings has been covered
Electrical junction box visible
Opposite lot's house frame is being put up
View from front
View from adjacent lot to the left
Temporary Electrical power box
Steel bars to strengthen the slab
Styropor to stabilize the concrete slab
Called the Site Supervisor and I was informed that they're preparing the site for slab concrete pouring on 2nd December and that frame might probably start on 4th December. Will go there Monday, 1st December to throw in the gold coins before they pour the concrete. :-)