Bricks Cleaned, Caesarstone Benchtop Installed, Doors in place, Painting Works Finished - Day 118


bricks cleaned with acid wash


bricks cleaned with acid wash


bricks cleaned with acid wash


bricks cleaned with acid wash


feature wall painted in lounge area


main entry door


garage and porch


kitchen, pantry and fridge space


caesarstone benchtop on kitchen sink


bricks cleaned as can be seen outside of theatre room


view from theatre window, kitchen is visible

According to Simonds website, the following items still need to be done before they finish the Final stage and organize handover of the house.

Painting - done
Brick Clean - done
Kitchen and Ensuite Caesarstone Benchtop installation - done
Installation of Doors - done
Tiling of Floors/Walls for wet areas - items delivered
Timber flooring installation
Installation of Downpipes for Stormwater Drain
Shower Screens
Mirrors
Door Knobs
Shelves for Robes, Pantry
Plumbing Fit off for taps, toilet, sinks
Electrical Fit Off - power points, lights
TV Point
Ducted Vacuum Connection
Flyscreens
Garage Doors
Pavement
Ducted Heating
Ceiling Insulation
House Clean
Final Site Clean
Quality Assurance Assessment
Evaporative Cooling