Friday, March 20, 2009

Slab Steel Delivered - Day 20


Inside the fence with mound of soil


Rocks, I wonder where they came from as they weren't there during my previous visit


Power panel presumable where they will tap power for the contractors' tools


Steel which will be used for Slab foundation

18 November 2008

Went onsite and found steel which will be used for slab has been delivered and placed just outside the temporary fencing on our block of land. Also found set out pegs installed to mark out house position. The power panel connected to underground has also been installed. Still waiting for a call from the Site Supervisor as to when the concrete will be poured.

No comments: